Skip to content

Playground Installation Services

Playground Installation Services | PlaygroundProvider.com
Commercial • Turnkey • Code-Compliant

Playground Installation Services

Design-to-turnover playground builds across Alabama, Georgia, and Tennessee—powered by PlaygroundProvider.com and delivered by ApexElite Outdoor Solutions. One vendor. One schedule. One clean install.

ASTM & CPSC-aligned install practices
ADA-accessible routes & layouts
Turnkey: equipment • surfacing • shade • site prep
Coverage: AL • GA • TN — rapid mobilization

Everything you need for a launch-ready playground

Precision Installation

Anchor-true assembly, torque-verified hardware, and punch-free turnovers—built for decades of heavy play.

Safety Surfacing

PIP rubber, turf, or EWF—specified to fall-height, drainage, and maintenance realities.

Shade Structures

Engineered canopies and sails to reduce heat load and extend usable hours.

Site Prep & Logistics

Demo, haul-off, grading, drainage, and coordinated deliveries to protect your schedule.

Design Support

Layout optimization, age zones, inclusive routes, and spec alignment with your budget.

Post-Install Support

Owner training, maintenance guides, and warranty coordination to keep play open.

AL • GA • TN
Regional coverage
Turnkey
Equipment + surfacing + shade
Fast
Streamlined staging & mobilization

Proven 5-Step Install Process

1. Scope & Layout — Verify equipment lists, fall zones, access routes, and utilities.
2. Site Readiness — Demo, grading, drainage, base prep, and staging plan.
3. Build & Set — Footers, anchors, verticals, decks, clamps, torque checks.
4. Surface & Shade — PIP/turf/EWF install and engineered shade set.
5. Closeout — QC walk, O&M handoff, and punch-free turnover.

Who we build for

Daycare & Preschool

Age-split zones, secure perimeters, licensing-friendly layouts.

Schools (K-12)

High-capacity systems with clean circulation and supervision lines.

Parks & Recreation

Durability, vandal resistance, and easy maintenance cycles.

Faith-Based & HOA

Smart footprints and multipurpose shade to maximize budgets.

Municipal & Housing

Bid-spec compliance, submittals, and tight timelines.

Healthcare & Inclusive

Universal access, sensory features, and quiet routes.

Installation FAQs

How long does a typical install take?

Small daycares: 1–3 days. School/municipal parks: 3–7+ days. Complex scopes vary based on site readiness and weather.

Do you help with permitting?

Yes. We coordinate submittals and provide drawings/specs for your AHJ. Local timelines vary.

What surfacing is right for us?

PIP rubber = seamless and premium; turf = strong drainage and aesthetics; EWF = budget-friendly. We spec to fall-height and maintenance plan.

Get a same-day install game plan

Send your site address, photos, and desired age ranges—our team will return a phased plan with budget options.

© PlaygroundProvider.com • In partnership with ApexElite Outdoor Solutions
Service Area: Alabama • Georgia • Tennessee
Fast links: HomeProcessFAQContact

Contact form | Request a Quote